Transfer engineering data

Vorheriges Oben Nächstes Helps selection copy topic address english version

HMIs, human machine interfacesEagle ET/MT-3x6...Transfer engineering data

 

Click to expand or collaps information.  with SPSPlusWin

 

There are two possibilities available to transfer design data into the target device. Generally, SPSPLUSWIN checks before the transfer, whether the project has been modified after the last generating process. If the project has not been modified, the dialogue for transferring the data to the target device is opened immediately. However, if the project has been modified in the mean time, you are first requested whether the data are to be generated anew before being transferred into the target device.

 

Open the menu Project.

Select the menu item Transfer or press the key combination <CTRL-T>.

 

Menue_Prjkt_Transfer

 

If a modified project has not been generated at this point you will see the following dialogue:

 

Dlg_NewCreating

 

Click on "Yes" if you wish to transfer the modifications, too.

 

 

The transfer dialogue is displayed.

 

Dialogue for transfer via serial interface:

Dlg_DwnToTrgtDev_COMDlg_DwnToTrgtDev_COMConf

 

Dialogue for transfer via Ethernet (ET/MT-3x6 & ET-208 only):

Dlg_DwnToTrgtDev_ETH

 

Select the PC interface to which the programming cable is connected.

Select the appropriate baud rate for the transfer. (not applicable for Ethernet transfer).

Select the target memory (dependent on type of operator interface).1

Define the communication parameters (not applicable for Ethernet transfer) and click on "OK" .

 

Now the following window will pop up, showing you the progress of the transfer:

 

You may also store the project engineering data on a USBi drive.

 

For this, select the USBi drive as the target for the data from the "PC - Interface"  selection field.

dlg_dwnloadtostick_en

 

How to load these into a device is explained in the chapter cicon2 Load application data.

 

 

Click to expand or collaps information. with Movicon

 

The project data of a project created using Movicon can be transferred to the operating and monitoring device via a TCP connection.

 

Once you have created a project with Movicon, proceed as follows to upload the project to the operating and monitoring device:

 

Click on the Fgr_BtnUpload button in the tool bar.

Fgr_Toolbar_Actions

 

or, alternatively, via the menu bar,

 

Fgr_Mnu_Upload

 

in order to open the dialogue for the transfer to the target device.

 

Fgr_Upload_Data1

 

Select "TCP" as the transfer mode.

Enter the IP address under which the target device is registered in the network into the Server field.

Enter "any" for User Name.

Leave the password field blank.

Select "\" for the transfer target.

 

Fgr_UploadTargetSelect

 

Click on Fgr_Upload_Btn to start the transfer.

In the following dialogue, select

 

Fgr_DlgSpeedSelection

 

If applicable, reply to the question of whether you want to overwrite an existing project with "Yes".

 

Fgr_QstnProjectOverwrite

 

The transfer dialogue will now pop up again.

 

Fgr_Upload_Data2

 

Various status messages will be issued in the bottom text field.

The message "Upload terminated successfully" informs you that the project has been successfully transferred to the device.

 

<< back