Initial start-up

Vorheriges Oben Nächstes Helps selection copy topic address english version

HMIs, human machine interfacesET-208Initial start-up

 

The following components are required for fast commissioning and the initial test:

ET-208 Operator Interface

Power supply 24V DC / maximal 0,9A 85VA to 250VA maximal 0,4A (Details see cicon2 Power supply AC or 24-VDC.)

CD with programming software "SPSPlusWIN" oder "Movicon"

Programming cable for downloading projects.

PLC connection cable (depending on the cicon2 PLC interface)

 

 

General
information
BtnSymbol
Configuration
device
BtnSymbol

 

Further Informations:

Symb_Internet SPSPlusWin-Hilfe

 

 

<< back